Jump to content

Costs change after re-link and rez


TANAKAAKIO Inshan

Recommended Posts

Hello.

I made an experimental work-in-progress car with Blender2.57.1.
And uploaded those meshes as single dae by default.
The car is 5 meshes(primps).

The cost of the rezzed single linkset was 46.
After unlinked and re-linked the linkset, the cost became 86.
I took and rezzed the re-linked the linkset.
The cost became 46.
It's back on.

Physical cost s did not changed.

Using ProjectViewer-Mesh 233328 Completed:2011/6/21

 

 

Costs change after re-link and rez

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
×
×
  • Create New...